subscribesubscriber servicescontact usabout ussite mapBuy a Classified
Sat, Nov 21 2009 

Published: July 15, 2007 11:43 am    print this story  

Up And Running

Wind-solar study can go ahead at FSU

Jennifer Raley
Cumberland Times-News

FROSTBURG — Now that the installation of the solar panels and wind turbine is complete, Frostburg State University will begin to study the pros and cons of renewable energy.

“The main purpose is to generate unbiased data that will be available to students, faculty and members of the community,” said FSU physics and engineering professor and project coordinator Hilkat Soysal.

Through a grant from the Maryland Energy Administration, a residential- scale solar- and wind-powered energy system was constructed at the FSU Fuller House on Braddock Road.

The 2-kilowatt solar panels were installed in early June, and the 1.8-kilowatt, 33-foot-high, wind turbine was installed July 6 by Cumberland-based Big D Electric.

“The goal of the project is to give residents accurate information so they can make cost-effective decisions,” said Oguz Soysal, FSU physics and engineering professor and project leader.

In addition to analyzing the pros and cons of renewable energy, the study will compare the effectiveness of solar and wind energy.

“In some cases, a combination of wind and solar may be more cost- effective,” said Oguz.

Energy-monitoring instruments will be installed to make system data available real time on the Web, said Hilkat. FSU students will be involved in the study.

As part of the project, residents may borrow anemometers to measure wind speeds at their homes.

A renewable energy symposium and expo will be held at FSU’s Compton Science Center on Sept. 14 and 15.

For more information, contact Hilkat or Oguz Soysal at renewable@frostburg.edu.

For more information about FSU’s wind-solar energy system and to view construction photos, log onto renewable.

Jennifer Raley can be reached at
jraley@times-news.com.

print this story  

Photos


From left to right, Betsy DeLozier, Bill Ford, Jimmy Poling and Brandon Norris bolt on the Wind-Solar Energy System propeller blades at Frostburg State University Fuller House. Wesley Haines/Cumberland Times-News (Click for larger image)


Ford, Norris and DeLozier mount the system on a 33-foot utility pole. Wesley Haines/Cumberland Times-News (Click for larger image)



autoconx
Premier Guide
Find a business

Walking Fingers
Maps, Menus, Store hours, Coupons, and more...
Premier Guide
Premium Jobs

PATIENT SERVICES SUPERVISOR-

Established Primary Care Health Center in Cumberland, MD is looking for an energetic team player to immediately fi
...>MORE

Driver

Call Today!
(866) 451-2864
www.SmithDrivers.com
EOE
...>MORE

STATIONARY ENGINEER 2ND GRADE
Frostburg State University seeks applications for a full-time Stationary Engineer 2nd Grade. Hourly rate $13.87 and incl...>MORE

See all ads

Premium Autos

Call our Classified department
at 301.722.4604 to advertise here!...>MORE

See all ads

Premium Extras

Call our Classified department
at 301.722.4604 to advertise here!
...>MORE

See all ads


Tri-State Home Finder Tri-State Travel Companion

 

Community Newspaper Holdings, Inc.CNHI Classified Advertising NetworkCNHI News Service
Associated Press content © 2009. All rights reserved. AP content may not be published, broadcast, rewritten or redistributed.
Our site is powered by Zope and our Internet Yellow Pages site is powered by PremierGuide.
Some parts of our site may require you to download the Flash Player Plugin.
View our Privacy Policy
Advertiser index